• Login
  • Register
  • Search

Research Report on the mode of "work instead of training" for scaffolders of attached lifting scaffold

Tao Ren

Abstract


the attached lifting scaff old is an external scaff old with anti overturning and anti falling devices, which is erected at a certain
height and attached to the main structure of the building, and makes the whole scaff old climb or fall layer by layer with the main structure
through its own lifting and lowering equipment and safety devices. The attached lifting scaff old is usually composed of frame structure, wall
attached support, anti tilt device, anti fall device, lifting mechanism and control device. The scaff older of the attached lifting scaff old mainly
includes two parts: one is to erect or dismantle the scaff old of the attached lifting scaff old, which is mainly carried out at the beginning or
end of the construction; The second is the lifting or lowering of the frame during layer by layer construction, including daily maintenance
and overhaul.

Keywords


scaffold;Construction;Attached lifting scaffold

Full Text:

PDF

Included Database


References


[1] Mingshu Xu Application of attached lifting scaff old in high-rise building construction [j]Jiangxi building materials, 2022 (08): 270-272

[2] Min Fang Evaluation on the eff ect of the training mode of "replacing training with work" in enterprises [j]Human resources development, 2021 (16): 84-

85

[3] Qiang Wu,Congtao Qu,Dong An Application and management of high-rise building construction scaff olding [j]China architecture decoration, 2022 (07):

89-91

[4] Professional skill assessment standard scaff older: t/zjx 006-2018[s].2018

[5] Weili Hao Construction process and safety management of external scaff olding in high-rise buildings [j]China real estate industry, 2019 (23): 209

[6] Chen Liu Matters needing attention during scaff old erection [j]Sichuan cement, 2021 (04): 51-52

[7] Xiaoe Xu All steel attached lifting scaff old and its installation method [j]Building materials development orientation (2), 2022,20 (5): 61-63

[8] Shenghua Wu Importance and key points of safety management in construction engineering management [j]Building materials development orientation (2),

2019,17 (1): 273-274

[9] Chuzhou Anhui Province: "replacing training with work" makes sure that workers' employment training is correct [j]China employment, 2020 (11): 58

[10] Zhongqun Wang Anqing City, Anhui Province: skillfully use "work instead of training" to promote job stabilization and employment expansion [j]China

employment, 2020 (11): 36-37

[11] Mingming Xu Construction of attached lifting scaff old for prefabricated buildings and its special position treatment technology [j]Journal of Changzhou

Institute of technology, 2021,34 (05): 5-9

[12] Weili Hao Construction process and safety management of external scaff olding in high-rise buildings [j]China real estate industry, 2019 (23): 209

[13] Zhiwen Zhang,Yujia Zhang,Cheng Zhang, etal Application Research on demolition of attached lifting scaff old [j]Construction supervision, 2022 (4): 82-

85

[14] Qiming Zhou Demolition construction technology of attached lifting scaff old in super high-rise building [j]Engineering construction, 2022,54 (10): 57-61

[15] Tiehong Zhao Problems and Countermeasures in safety management of construction scaff olding [j]Real estate world, 2021 (15): 99-101




DOI: http://dx.doi.org/10.18686/modern-management-forum.v7i1.7420

Refbacks