Analysis of Problems and Countermeasures in PE Pipeline Installation Process
Abstract
Keywords
Full Text:
PDFReferences
[1] Shi Dan. Discussion on safety net distance and insufficient soil covering depth of buried gas pipeline [J]. Chemical Engineering and Equipment, 2022,(04):244-245+252.
[2] liu xiao, xiao jiumei. Discussion on welding construction method of polyethylene pipe fittings for outdoor water supply network in residential buildings [J]. Shanghai Building Materials, 2021,(05):34-39.
[3] Zhang Fengtao. Problems to be considered in the design of PE pipeline for urban gas [J]. China Petroleum and Chemical Standards and Quality, 2020,40(18):148-149.
[4] Wang Ming Dynasty. Research on installation technology of large diameter PE pipeline in municipal water supply project [J]. Engineering Technology Research, 2021,6(03):92-93.
[5] Lei Sumin, Bai Liping, Fang Yuanyuan, etc. Polyethylene pipe for urban gas pipeline trenchless repair and renewal project [J]. Gas and Heat, 2020,40(12):32-36+42-44.
DOI: http://dx.doi.org/10.18686/ahe.v7i30.10984
Refbacks
- There are currently no refbacks.